This page is here to capture the my first race car Development in photo’s
Build
Car purchased – 13/10/2013
Brake Inspection – 30/11/2013
Interior Strip – 06/11/2013
Roll Cage Fit Up – 05/12/2013
Brake Strip & Service – 02/01/2014
Air Con Removal – 05/01/2014
Rear Brake Reassemble 05/01/2014
Gearbox Out Ready for Sending off to be tested and sealed – 22/01/2014
The PG1 gearbox has to be removed, sent off to Dan Surridge for Testing and Sealing. It takes 2.5 hours to get the box out over two evenings very unusual for a 25/ZR but it needs head on two bolts and a lot of man power but its out ready to be shipped.
Front Bumper Customization – 26/01/2014
So I decided a long time ago to stick with a similar scheme to my MG Express which is Graphite with XPower Green Decals for those who haven’t seen it. The car is Starlight Silver but will still look great with XPower Green. Unfortunately no one actually knows a code for XPower Green let alone stocks it in usable cellulose for me so the nearest mainstream I have used is Kawasaki Green.
Bonnet Pins & On Going Welding – 15/02/2014
Fabrication & Welding Complete and Painted – 25/02/2014
Gearbox, Clutch, New Rad, OEM Airbox, Front Brakes – 25/02/2014
Roll Cage Fitting – 5- 22/03/2014
Handbrake Back In – 22/03/2014
Fire Extinguisher Fitted – 22/03/2014
Initial Seat Fitting and Boot Pins – 25/03/2014
Dad finished Cut off switch and Decal’s on – 15/04/2014
Silverstone Package
Head Removal ready for refurbish – 7/04/2014
Upgrade Bottom Oil Rail – 14/05/2014